2018

National Exhibition Centre

Client

National Exhibition Centre

Location

Birmingham

Architect

Acivico Ltd

Fabric

PVC

Product

3 Dimensional fabric facade and printed over-cladding

We were approached by the NEC to give the exteriors of Halls 1 and 5 an exciting new look as part of their strategic transformation called ‘project face-lift’.

The project consists of a series of translucent fabric pyramids inter-spaced with dramatic printed fabric panels. On the steel frame forming the pyramids we installed colour change LED back-lighting to allow the client to develop a series of pre-programmed light shows.

The graphics are the largest example in the UK of a specialist long life printing technique developed specifically for architectural use.

Challenge

It was a challenging programme for the installation team, with a deadline of completion before the start of the Autumn show season.

Result

The project took only 5 months from design through to installation. Our client was delighted that we finished a week ahead of schedule and on budget. This was largely achieved due to the proactive client team and the support of our regular subcontractors.

With the addition of the Bear Grylls Adventure Centre, a Casino, Conference Centre and two new Hotels the NEC is gearing up to be a major destination in the UK.

YouTube

By loading the video, you agree to YouTube’s privacy policy.
Learn more

Load video

similar projects

  • Denmark

Frederiksberg

  • London

Thamesmead

  • Jeddah

Jeddah Luxury Villa

Related Articles

Base Structures gives the NEC a spectacular new look

As part of an exciting £4.5 million transformation of Birmingham’s NEC, Base Structures has installed a stunning fabric façade to the exterior of Halls 1…

some of our clients

Network Rail Logo
zsl london zoo logo
The NEC Birmingham
MCC Logo Lords
Mace Logo
ISG Logo