2006

Pollok Shopping Centre

Client

Glasgow

Location

Glasgow

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Bespoke Covered Walkway Canopy

Base Structures were asked to design and install a tensile fabric sheltered walkway 120m long, running from the shopping centre to the bus stops. It spans between the shopping centre and the next door bus station. 

Our Solution

We engineered, designed, manufactured and installed the fabric walkway canopy including the supporting steel structure, rigging cables and fittings. This installation was very successful, it was completed ahead of time and our clients are extremely pleased with the new walkway.

Results

The fabric walkway provides the shopping centre with an impressive and effective sheltered area for the customers.

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Parkwest

Client

Glasgow

Location

Dublin

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Fabric Clad Space Frame Roof

This tensile fabric cladding system is designed to cover the existing space frame roof to the Park West Railway Station. Having not long completed an identical tensile structure at nearby Adamstown Railway station, our clients Mero and Irish Rail were very pleased with the success of that structure and happy for this second fabric clad roof to go ahead.

Our Solution

Using fabric as cladding in this way allows far more natural light into the building than more traditional alternatives and creates a very pleasant station environment.

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Papworth

Client

Glasgow

Location

Cambridge

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Architectural Fabric Walkway Canopy Structure

Our brief was to build a covered walkway canopy as a feature for the new village centre building. The fabric structure provides sheltered access and serves as a method of improving the image of the centre to visitors. We designed, manufactured and installed the fabric walkway canopy including the supporting steel structure, rigging cables and fittings. We also installed the perforated stainless steel balustrade and hardwood walkway and handrail.

Our Solution

This project was fairly complex with the combination of the balustrade and relied on good preparation. The installation went very well and in on time. 

Results

The structure looks good and has improved the centre. All parties are pleased with the results.

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Oldham Bus Station

Client

Glasgow

Location

Manchester

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Replacement PTFE Roof

Following a fire at the Bus Station in which large areas of the existing tensile roof structure was damaged beyond repair, Base Structures were commissioned to remove the fire damaged areas of fabric, survey the existing steel and assess for structural damage, and then to replace all damaged fabric elements with new and make good the finished tensile structure.

Our Solution

The existing roof is made up of a double skin PTFE multi barrel-vaulted structure contained within a large, essentially triangular, outer ring beam. All fabric elements were fixed to the steel structure via luff track or clamp plates. 

Results

An aluminium facade contains the guttering and gives a nice finished appearance to the entire perimeter.

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Old Park Primary School

Client

Glasgow

Location

Telford

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Multi-Conic Walkway

Sitting at the heart of Malinslee, Telford, The Old Park Centre is at the heart of the community. A regeneration project in 2008 aimed to act as a catalyst to lift a deprived area of Telford into a blossoming community hub. Part of this project resulted in the amalgamation of two existing schools into the newly formed Old Park Primary School. This new school had been carefully designed by BBLB Architects to accomodate 450 pupils in as stimulating an environment as possible. The external areas of the school were of great importance to the overall design and redevelopment initiative and this attractive membrane canopy plays a key role. 

Our Solution

A multi-conic walkway to provide protection from the elements and allow year round use of the outside environment by the children. The perspex domes at the top of each cone allow increased light levels under the canopy in dull weather whilst the membrane shelters the pupils from both sun and rain.

Results

The entire quadruple cone was manufactured and lifted into place in one piece and will enable enjoyable outdoor playtimes for a long time to come! 

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Oaklands School

Client

Glasgow

Location

London

Contractor

WH Malcom Construction

Fabric

PVC

Rooftop Playground Canopy

As a part of Tower Hamlets biggest ever spend on school improvements, the local council has partnered with the construction company Bouygues UK, to deliver £230m of refurbishment as a part of the Building Schools for the Future (BSF) programme across their borough. 

Our Solution

Base Structures were given the opportunity to tender for this project following previous successful collaborations with the Director of one of the senior companies already involved. The early brief from the project engineers identified that the canopy could not impose additional loads onto the surrounding parts of the building and so the entire structure is supported solely by the four corner columns which are bolted directly on top of the existing building’s structural steel skeleton. 

For this reason and due to the position of the canopy towards the top of the building, extensive lightning protection had to be added across all of the joints in the steel framework so that in the event of a strike, the massive electrical charge would pass through the building and be harmlessly dispatched through existing steel structure to earth. 

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Newhaven Energy Recovery Facility

Client

Glasgow

Location

Newhaven, East Sussex

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Architectural Mesh Cladding

Base Structures were asked to tender for the fitting of a screen to minimize and soften the industrial visual impact of the cooling section built at the rounded northern end of the new £140 million Energy Recovery Facility (ERF). When operational this new ERF will take receipt of some 210,000 tonnes of municipal solid waste each year, to be treated in two boilers. The challenge to Base Structures was to install a suitable screening for the air-cooled condenser area: a 54 m diameter half dome on the northern end of the Newhaven ERF which needed to obfuscate the harsh detail of the externally mounted cooling equipment and yet would allow the necessary volume of air through it.

Delivering a structural solution required us to develop a fully engineered aluminium fabric clamping detail that would complement the inherent flexibility of the fabric thereby ensuring that the daily stresses and strains imposed on these very large wind catching sails would dissipate uniformly into the enclosing skeletal steel frame.

Our Solution

“We hit upon the idea of a ‘wavy’ clamping system,” says Base Structures’ Head of Projects, Mark Smith, “using an aluminium extrusion which allowed us to pass the load evenly through the steel, rather than through the PVC. We made a series of different prototypes until we evolved a fully engineered design that achieved the loads necessary.”

The architect identified a 50% open mesh fabric as delivering on these functional criteria. To enable this relatively light weight architectural mesh material to perform structurally it contains galvanised steel threads which are woven through it to a regular pattern. 

Two different clamps were developed: an ‘intermediate’ design to hold the sections of fabric together, and a ‘perimeter’ design, used to clamp the joined sections to the supporting steel structure. The only modification necessary was to pre-stress the mesh before it was clamped in.

Results

Installation of the mesh above the heavy process equipment took around six weeks for a team of six on the ground fitting sections together and 14 riggers, clamping and bolting the sections into place. Having refined this techique, Base Structures is confident it will significantly reduce this build time for future projects.

Like a vision taken straight from the set of Blade Runner, East Sussex’s new Energy Recovery Facility perches in the estuary of the River Ouse reclaiming the energy stored within our waste which would otherwise end up as landfill.

“Base Structures found a technical solution on the basis of their knowledge, creativity and problem solving attitude. They transferred successfully the information from design study onto the final construction.”
Andreas Clausen, HOCHTIEF Construction Manager

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

MSCP Gatwick

Client

Glasgow

Location

Gatwick Airport

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Car Park Kiosk Canopies

Base were asked to design, manufacture and install the branch frame canopy including the supporting steel structure, fabric membrane and associated fittings.

Results

This fabric canopy forms part of the refurbished entrance to the Multi Storey Car Park at Gatwick Airport. It not only provides protection for car park patrons when using the ticket machines but also serves as an attractive architectural feature to enhance the surroundings. 

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Morfa Shopping Park

Client

Glasgow

Location

Wales

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Barrel Vault Canopies and Hypar Sails

We designed, manufactured and installed a series of high level tensile fabric barrel vault canopies over the existing walkways surrounding the building. 

Results

With the addition of two dynamic, four cornered hypar sails over the entrance, an otherwise unremarkable new building becomes an elegantly land marked feature on the cityscape.

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

2006

Medicentre

Client

Glasgow

Location

Inverness, Scotland

Contractor

WH Malcom Construction

Fabric

PVC

Product

Services

Multiple Fabric Canopy Walkway

We were commissioned to design, fabricate and install a fabric covered walkway structure as part of the courtyard landscape at the Medicentre. 

Results

The tensile structure, which consists of five fabric sails supporting steel structure and integral lighting, provides shelter to patients traversing between two buildings as well as being an attractive addition to the courtyard. When lit up in the evening, the structure creates a very dramatic effect which the client is very pleased with.

Similar Projects

  • Glasgow

Glasgow Airport

  • Wolverhampton

Bentley Bridge Retail Park

  • Telford

Telford Railway Footbridge

some of our clients

Network Rail Logo
zsl london zoo logo
The NEC Birmingham
MCC Logo Lords
Mace Logo
ISG Logo