As part of their gym refurbishment, David Lloyd approached us to replace the fabric roof to their members pool in the Reading club. Utilising our expert fabric team, we carried out the safe dismantle and removal of the old membranes and associated components.
We then carried out a 3D survey of the structure to enable a re-design incorporating improvements to the replacement components.
Once the new bespoke fabric design was agreed we set about manufacturing and installing both the new inner and outer fabric roof membranes, all within a 2-week timeframe to ensure that the roof was re-installed as quickly as possible, and the pool closure time was minimal.
We also carried out cleaning works to the structural steelwork to give the whole pool area a fresh look for the refurbishment project.
Many of the UK’s fabric structures that were installed before the millennium are nearing the end of their design life and as such owners may…
As the wind and rain move into the UK this winter, tensile fabric structures are under an enormous amount of load – the fabric itself…
Over the years, canopy fabric technology has improved dramatically, and although in most cases our pre-designed canopies or bespoke systems will still be doing their…